Tuesday, January 24, 2012

DAM BREAK REPORT CONFIRMS 35 LAKH DEATHS DUE TO COLLAPSE OF MULLAPERIYAR

MULLAPERIYAR DAM BURST SHOWS DEATH OF 35 LAKHS OF KERALITES
Prof.T.Shivaji Rao,
Director, Center for Environmental Studies,
GITAM University, Visakhapatnam
http://www.therabbitrun.com/2012/09/mullaperiyar-dam-history-and-issues/ ( dam break animation)
(Videos on Dam collapses in the world)
http://sites.google.com/site/profshivajirao/polavaramdam-2   (Polavaram dam break analysis)
http://tshivajirao.blogspot.com/2012/01/dam-breach-flood-routing-for-rock-fill.html

There are serious violations on the safety aspects of the dam in terms of seismological safety, hydrological safety and environmental safety as discussed in detail under the above websites.

The dam has been under-designed because at the time of its construction cement was not available and hence neither a masonry dam in cement mortar nor a concrete dam with cement mortar could be built to ensure better safety standards.  The old methods of construction followed about a century ago enabled the engineers to use only surkhi mortor with lime, sand and rubble stone was used for the construction of the dam.  Since the dam was underdesigned and with poor materials of construction it is bound to collapse due to aging also.  Moreover the magnitude of peak floods to be used for the spillway design was based upon rough estimates which do not confirm to the modern estimates of extreme floods as recommended by experts of the International committee on large dams Even the seismsic potential was under- estimated Hence there are abundant chances for the dam to collapse and such an accident will result in economic bankruptcy to the states that depend upon Periyar river water. Consequently the people of Kerala living downstream of the dam are vociferously demanding for the implementation of dam review policies followed for evaluation of safety of the existing dams and take remedial actions to protect the lives of the people and their properties.  But there is no unanimous agreement on this subject of dam safety between Kerala, Tamilnadu and the Union Government and this as resulted in a controversy on the safety of the dam.
A serious controversy on the safety of Mullaperiyar dam is raised by the people in Tamilnadu and Kerala.  While Kerala is demanding for the removal of the existing aged and decaying dam on the plea that its inevitable collapse within the near future will result in an avoidable man-made disaster like the Bhopal tragedy in India and the Fukushima nuclear accident in Japan.  Due to this disaster waiting in the wings more than a lakh of people between the dam and the Iddukki reservoir 40km below the dam more than 35 lakhs of people in the lower reaches of Periyar river upto Ernakulam-Cochin belt will be drowned causing not only loss of millions of lives of human and animal population but also precious housing properties and agriculture fields placing a total loss amounting to more than one lakh crores of rupees.  This economic burden will have to be borne directly or indirectly  by all the people of various states in the country.  Tamil Nadu Government is insisting that the existing dam is safe and that it should not be decommissioned at any rate because the Tamilians may lose their rights over irrigation water transfer from Periyar river in Kerala to Vaigai river in Tamilnadu.  This problem can be simply solved if Kerala state is genuinely concerned about saving the lives of 35 lakhs of Keralites by constructing 2 or 3 smaller dams in between the Mullaperiyar dam and Iddukki dams.  But the urge to construct these dams cannot be perceived by the people of Kerala and its elected representatives in the state legislature unless they are presented with a Mullaperiyar dam break scenario with its damaging impacts on hundreds of villages, towns and cities in the Iddukki, Ernakulam and Kottayam districts.  For this purpose a dam break analysis for Mulaperiyar dam is carried out by using the popular national weather service dam break flood forecasting model (NWS DAMBRK) for assessing the likely maximum flood discharge and elevation to be attained by the flood inundation for several habitations down steam in the eventuality of a dam failure. 

NWS – DAMBRK  MODEL  DESCRIPTION:
            The U. S National Weather Service (NWS) initially developed DAMBRK program (Fread, 1984) in 1977.  Research has been ongoing in developing improvements in the  DAMBRK  model allowing it to have an increasing range of  application ( Fread, 1989). The model has wide applicability, it can function with various levels of input data ranging from rough estimates to complete data specification, the required data is readily accessible and it is economically feasible to use with minimal computational effort on microcomputers.
DAMBRK model can be used to develop the outflow hydrograph from a dam breach and hypothetically route the flood through the downstream valley. The governing equations of the model are the complete one-dimensional Saint-Venant equations of unsteady flow  which are coupled with internal boundary equations representing the rapidly varied flow through structures such as dams and embankments which may develop a time dependent breach. Also, appropriate external boundary equations at the upstream and downstream ends of the routing reach are utilized. The system of equations is solved by a nonlinear weighted four-point implicit finite difference method. The flow may be either subcritical or supercritical.
            The hydrograph to be routed may be specified as an input time series or it can be developed by model using specified breach parameters (size, shape, time of development). The possible presence of downstream dams which may be breached by the flood, bridge / embankment flow constrictions, tributary inflows, river sinuosity, levees located along the downstream river, and tidal effects are each properly considered during the downstream propagation of the flood. DAMBRK may also be used to route mud and debris flows using specified upstream hydrographs. High water profiles along the downstream valley, flood arrival times, and hydrographs at user selected locations are the standard DAMBRK model output.
DATA REQUIREMNTS FOR NWS – DAMBRK MODEL
The DAMBRK model was developed by National Weather Service (NWS) so as to require data that was accessible to the forecaster.  The input data requirement are flexible in so far as much of the data may be ignored (left blank on the input data cards or omitted altogether) where a detailed analysis of a dam break flood inundation event is not feasible due to lack of data or insufficient data preparation time.  Nonetheless the resulting approximate analysis is more accurate and convenient to obtain than that which could be computed by other techniques.  The input can be categorized into two groups.
The first data group pertains to the dam: (the breach, spillways, and reservoir storage volume).  The breach data consists of the following parameters: T (failure time of breach, in hours), b (final bottom width of breach), Z (side slope of breach), hbm (final elevation of breach bottom), ho (initial elevation of water in reservoir), hf (elevation of water when breach begins to form), and hd (elevation of dam).  The spillway data consists of the following : hs (elevation of uncontrolled spillway), Cg (coefficient of discharge of gated spillway), Cd (coefficient of discharge of crest of dam), Qt  (constant head independent discharge from dam).  The storage parameters consists of the following: a table of surface area (As) in acres or volume in acre-ft. and the corresponding elevations within the reservoir.  The forecaster must estimate the values of T,B,Z,Hbm , and Hf .  The remaining values are obtained from the physical description of the dam, spillways, and reservoir. In some cases Hs, Cs, Hg and Cg and Cd  maybe ignored and Qt used in their place.
The second groups pertains to the routing of the outflow hydrograph through the downstream valley.  This consists of a description of the cross-sections, hydraulic resistance coefficients, and expansion coefficients.  The cross-sections are specified by location mileage, and tables of top widths (active and inactive) and corresponding elevation.  The active top widths may be total widths as for a composite section, or they may be left floodplain, right flood plain, and channel widths.  The channel widths are usually not as significant for an accurate analysis as the over bank widths.  The number of cross-sections used to describe the downstream valley depends on the variability of the valley widths.  They also depend on the availability of cross-section measurements. However, a minimum of two must be used.  Additional cross-sectional data to be input by the forecaster according to such criteria as data availability, variation, preparation time etc.  The number of interpolated cross-sections created by the model is controlled by the parameter DXM which is input for each reach between specified cross-sections.  The expansion-contraction coefficients (FKC) are specified as non-zero values at sections where significant expansion of contradictions occur.  But they may be left blank in most analyses.
            In the present case of Mullaperiyar dam due to non availability of detailed topographical sheets of the Periyar river basin the Google Earth satellite pictures have been used for measurement of distances, bed level elevations, locationof dams and reservoirs and human habitations upto Cochin.  It is found that the river slope for different river stretches with several water falls vary from an average of 10m  per km, 5m per km and 1m per km.  Since the super critical  flows below the water falls are some extent to modified by a few dams and reservoirs in lower Periyar basin and Bhutantankkettu reservoirs a gradient 1m per km has been considered and the input data has been incorporated in the DAMBRK computer model to obtain the flood depth elevations and the human habitations that will be submerged under a wall of flood arising due to the Mullaperiyar dam burst under the worst conditions of cloud burst which results in overtopping of the dam including the Earth dam on the left side.  The details of the output data on bed levels flood elevation levels and flood depths are presented in the tables and graphs furnished below.

  MULLAPERIYAR DAM – DAM BREAK ANALYSIS
   Table indicating distances from the dam,
Bed levels , Flood Elevation levels and Flood depths
Distance from Dam(Km)
Bed levels (m)
Flood Elevation (m)
Flood Depth (m)
0
827
850
23
10
804
826
22
30
768
785
17
40
750
763
13
50
720
730
10
70
252
264
12
100
70
82
12
120
36
48
12
140
20
32
12
170
9
21
12
180
7
19
12


 
Hundreds and thousands of people in several villages and lakhs of people in major towns and urban settlements will be drowned under flood depths varying from about 72ft. (23m) below the dam, 66ft (20m) at Vandiperiyar, 50ft at Upputhara, 40ft at Iddukki cluster of villages, 38ft. at Kaladyand its neighbouring villages and more than 38ft over hundreds of villages and towns including Cheranalloor, Kanzoor, Chowara, Aluva, ernakulam and Cochin.  The dam break model was run by assuming that the disaster will occur during a rainy season when all the tributaries of Periyar and the dams over them will be completely full and this additional flood due to Mullaperiyar dam break will cause the flood havoc, killing about 35 lakhs of people in the zone of influence of the floods.  While some of the dams at Iddukki may over flow and cause flood havoc in the intermediate zones of Todupula and Muvvattupula thre will be additionl water inflow from several tributaries like Idamalayar that add fuel to the fire and consequently the flood depths presented here are bounded to be under estimated to some extent.  Mullaperiyar dam is bound to collapse for several reasons including deteriorationof construction materials, frequent earthquakes, emerging extreme floods due to global warming and climte change impact, poor construction, mechanical or human failures.  Hence Kerala people must visualize this emerging scenario and exert pressure over their Government to save their lives and properties by taking timely action because a stitch in time saves nine.








SALIENT FEATURES OF PERIYAR PROJECT – PERIYAR DAM
GENERAL:
River   & Basin                                             : MullaiPeriyar River  &  Periyar Basin
Location                                                         : Lat 9o 03’ 20”   Long: 77o 08’ 45”
Construction Period                                      : 1887-1895
Cost                                                               : 43.00 lakhs (18 crores for strengthening work)
RESERVOIR:
Catchment area                                       : 232.60 sq.miles (602.4 sq.km)
Water spread area                                   :10.21 sq.miles (28.44 sq.km)
Design Flood                                            : 1.22 lakh cusescs (3454 cumecs)
FRL                                                          : 152’ (+2861’ {(or) +872.285 m}
MWL                                                        : 155’ {+2864’ (or) +873.20m}
Dead Storage Level                                  : 104’ {+2831‘ {(or) +857.65m}
Capacity of Reservoir at FRL                 : Gross 15,682mcft (444.06 mcum)
REGULATORS:
Vents                                                       : Old   : 10 Nos (36x16) or (10.97x4.88m)
Additional                                              :New : 2 Nos (40’x16’) or (12.19x4.88m)
Type                                                        :Old : Vertical Lift Shutter
                                                               : New: Radial Shutter
Crest Level                                            : 136’ (+2845ft) or 867.405m
Platform Top Level                               :177.65’ (+2886.75’) or 880.105m
Max.discharge                               Old : 86,000 cusecs (2483.54 cumecs)
                                                       New: 36,000 cusecs(991.08 cumecs)
                                                    Total : 1.22 lakh cusecs

http://expert-eyes.org/Mullaperiyar_Dam_features.html



Warning: If the maximum design flood for the dam is placed at 1.22 lakh cusecs by Tamilnadu when the International experts predict PMF of about 4 lakh cusecs how can anybody  assusre safety of dam on the basis of scientific and technical considerations?






2 comments:

Bijumon Thomas said...

Any Structural Expert will tell you if the structure has inherent weakness will come down with or without any notice the next day if not the next moment. It does not need an iota of assumptions & presumptions either positive or negative from a layman or even of an expert IITian. Why our politicians do not understand this as a basic problem with a fundamental entities in a business of serving the people. There are many structures older than this. Also suppose, age of a patient even by the best of the Global Doctor's be assessed and defines as say 25years for any reason, it does not mean he should leave this beautiful world at the end of 25th year because of his certification. But by appropriate medication and strengthening the same its likely, his chance to survive more can always be exploited.. If the Doctor wants and insist to hang for certifying his certificate then it's a different case..

SHIVAJI RAO- ENVIRONMENTALIST said...

strudy the following web site for more details on dam
http://jamewils.blogspot.in/2011/11/mullaperiyar-dam-technical-details.html
How this dam is very unsafe from seismological and hydrological points of safety have been presented in other web sites presented elsewhere
prof.T.Shivaji Rao.M.S.[Rice Univ.Texas,1962]
Director,centre for environmental studies,gitam university.visakhapatnam.India

About Me

My photo
Born in 1932 at Mudinepalli, near Gudivada, Krishna Dist. Andhra Pradesh, received Bachelors degree in Civil Engg., from Viswesaraiah Engineering College, Banglore (1956) and Masters Degree in Environmental Engineering from Rice university, Houston, Texas, (USA) (1962), Ph.D (Hony). Former Head of the Department of Civil Engineering and principal of College of Engineering, Andhra university.Formerly Hony.Professor in Andhra University,Manonmanian Sundarnar University,JNT University. Fellow of the Institution of Engineers,India Recipient of the University Grants Commissions National Award "Swami Pranavananda Award on Ecology and Environmental Sciences" for the year 1991. Recipient of Sivananda Eminent Citizen Award for 2002 by Sanathana Dharma Charitable Trust, Andhra Pradesh state. Presently Working as Director, centre for Environmental Studies, GITAM University, http://www.geocities.com/prof_shivajirao/resume.html http://www.eoearth.org/contributor/Shivaji.rao