ALAMATTI BACK -WATER CURVE AT 519.6 METERS-

ALAMATTI  BACK -WATER  CURVE  AT 519.6 METERS

Prof.T.Shivaji Rao,
Director,Center for environmental studies,
Gitam University, Visakhapatnam
Prof.M.Ramesh,
Head of the Department of Civil Engineering,
Gitam University,Visakhapatnam,


To understand basics of backwater curves caused by dams across the rivers see the following website:
Satara,sangli and Kolhapur Districts  are bound to get devastated by extreme floods due to increased height of Alamatti Dam. Why?
In Satara District,Sahyadari range  is having a height over 4500 feet above mean sea level to the subdued basin of Nira river in Phaltan tahasil, with an average height of about 1700 feet above mean sea level.
WHY KARNATAKA STATE IS HELPLESS IN PREVENTING FLOODING OF SANGLI DISTRICT
Irrigation experts told Frontline that both States, especially Maharashtra (by virtue of being the upper riparian), probably stored waters in their dams far in excess of the necessary storage level before the onset of the monsoon. They probably did not wait to build up storage levels slowly as the monsoon progressed fearing the level would come down if the monsoon failed. But with excess rains in the catchment areas in Maharashtra, the States were forced to release water from their dams, which had reached their full reservoir levels (FRLs) thereby aggravating the flood situation.
Even as the people are reeling under the impact of the floods, Maharashtra and Karnataka indulged in a dispute over the release of the Krishna waters. Maharashtra has accused Karnataka of not fulfilling its obligation to release adequate quantities of the Krishna waters from the Almatti dam so that the flood situation and the backwater effect in its inundated southern districts could be brought under control. It even got Prime Minister Manmohan Singh to intervene in the matter.
Karnataka has refused to release 6 lakh cusecs of water from the Almatti dam that Maharashtra has been demanding. On August 5, Karnataka released 4.20 lakh cu against an inflow of 3.57 lakh cu, reducing the water level in the dam to 516.4 metres, as against the FRL of 519.6 m.
Karnataka Chief Minster N. Dharam Singh said the release of 6 lakh cu would inundate 600 villages in Karnataka. But with Maharashtra increasing the outflow from its upstream Koyna dam (3.96 lakh cu was released on August 6) steadily, Karnataka, according to engineers at the Almatti dam site, will also have to increase gradually the outflow to 5 lakh cu. The water discharges from the Almatti dam have already affected over 60 villages in Hungund and Muddebihal taluks of Bagalkot and Bijapur districts.
According to the Water Resources Minister M. Mallikarjun Kharge, Maharashtra was needlessly creating a controversy over the discharge of water from Almatti. His contention is that the villages in Sangli and Kolhapur could not have been affected by the backwaters of the Almatti as they are located at a height of 538 metres above sea level. After all, floods had ravaged villages in both districts in 1964 and 1976, before the dam was constructed. He also claimed that in 2002-03 and 2004, when the dam had reached full storage level, no village in Maharashtra was submerged. Irrigation experts also point out that a joint survey by engineers from both States, which was later cleared by the Central Water Commission (CWC), stated that villages upstream up to and beyond Sangli would not be flooded even when the water level at the Almatti dam reached 524.256 m..See the following article on "DEVASTATION AND DISPUTE" in FRONTLINE  MAGAZINE,Chennai   
KARNATATAKA MINISTER,KHARGE IS MISLEADING ON FLOODING OF SANGLI, KOLHAPUR  AND SATARA REGIONS
     [Alamatti sumerges areas of Bagalkot,causing displacement]
http://www.indianetzone.com/46/geography_satara_district.htm
Roughness Coefficients (Manning’s “n”) for Overland Flow
Surface Description
n
Dense Growth
0.4 - 0.5
Pasture
0.3 - 0.4
Lawns
0.2 - 0.3
Bluegrass Sod
0.2 - 0.5
Short Grass Prairie
0.1 - 0.2
Sparse Vegetation
0.05 - 0.1
Bare Clay-Loam Soil (eroded)
0.01 - 0.0
Concrete/Asphalt - very shallow depths
(less than ¼ inch)
- small depths  (1/4 inch to several inches)

0.10 - 0.1
0.05 - 0.1
Roughness Coefficients (Manning’s “n”) for Channel and Pipe Flow                 
Reach  Description
n
Natural stream, clean, straight, no rifts or pools
0.03
Natural stream, clean, winding, some pools or shoals
0.04
Natural stream, winding, pools, shoals, stoney with some weeds
0.05
Natural stream, sluggish deep pools and weeds
0.07
Natural stream or swale, very weedy or with timber underbrush
0.10
Concrete pipe, culvert or channel
0.013
Corrugated metal pipe
0.012 – 0.024*
Spiral rib metal pipe
0.012
Corrugated polyethylene pipe
0.020
Smooth-lined corrugated polyethylene pipe
0.012
* Based on pipe diameter and manufacturer’s design specifications

DISTANCES OF VARIOUS STATIONS ALONG KRISHNA RIVER FROM ALAMATTI TO SANGLI(Approximate values as per Tourist Maps and Google Earth)
Station                              
Distance (in Km)
Cumulative Distance (in Km)
Alamatti dam
0
0
National Highway 218
24
24
NH 218 to Reservoir Approach
24
48
Res Appr to Algor
40
88
Algor to Hippargi
28
116
Hippargi to Halyal-Darur
25
141
Halyal to Kuduchi
26
167
Kuduchi to Diggarwadi
13
180
Diggarwadi to Shahapur (Jugal)
25
205
Shahapur to Narsobawadi
10
215
Narsobavadi to Ankali
25
240
Ankali to Sangli
10
250


ALMATTI Back water profile Calculations 15-01-2011 (for n=0.05, 31,000 cumecs, 519.6 m stage near Alamatti dam widths 1500 m)















1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Station
No. Trail
Elv. BL
depth,m
Elv.stage
Width
Area
Discharge
Velocity
Vel.Head
Total H
R
Sf term1
Sf term2
Sf
ALMATTI
0
489
30.6
519.6
1500
45900
31000
0.675381
0.023249
519.6232
29.40046
2402500
1.89032E+11
1.27095E-05
A to NH218-1
1
491
30
521
1500
45000
31000
0.688889
0.024188
521.0242
28.84615
2402500
1.7715E+11
1.35619E-05
A to NH218-2
2
491
29.12262
520.1226
1500
43683.93
31000
0.709643
0.025667
520.1483
28.03405
2402500
1.60718E+11
1.49485E-05
NH218
3
491
29.12324
520.1232
1500
43684.86
31000
0.709628
0.025666
520.1489
28.03463
2402500
1.6073E+11
1.49475E-05
N to Res Approach
1
494
26.15
520.15
1500
39225
31000
0.790312
0.031835
520.1818
25.26896
2402500
1.12867E+11
2.12861E-05
N to Res Approach
2
494
26.88844
520.8884
1500
40332.66
31000
0.768608
0.03011
520.9185
25.95782
2402500
1.23677E+11
1.94255E-05
A Res approach
3
494
26.89234
520.8923
1500
40338.51
31000
0.768496
0.030101
520.9224
25.96146
2402500
1.23736E+11
1.94163E-05
Res App to Algur
1
498
22.92
520.92
1500
34380
31000
0.901687
0.041439
520.9614
22.24034
2402500
73166067870
3.28363E-05
Res App to Algur
2
498
23.36484
521.3648
1500
35047.26
31000
0.88452
0.039876
521.4047
22.65894
2402500
77942962172
3.08238E-05
Res App to Algur
3
498
24.53144
522.5314
1500
36797.16
31000
0.842456
0.036174
522.5676
23.75447
2402500
91489209324
2.62599E-05
Algur
4
498
24.54817
522.5482
1500
36822.26
31000
0.841882
0.036125
522.5843
23.77016
2402500
91694547512
2.62011E-05
Al to Hippargi
1
508
14.58
522.58
1500
21870
31000
1.417467
0.102406
522.6824
14.30197
2402500
16457886076
0.000145979
Al to Hippargi
2
508
15.70304
523.703
1500
23554.55
31000
1.316094
0.088282
523.7913
15.381
2402500
21029995236
0.000114242
Al to Hippargi
3
508
18.46472
526.4647
1500
27697.07
31000
1.119252
0.063849
526.5286
18.02104
2402500
35896749875
6.69281E-05
Hippargi
4
508
18.78958
526.7896
1500
28184.38
31000
1.0999
0.061661
526.8512
18.33036
2402500
38021930862
6.31872E-05
Hi to Halyal
1
513
13.85
526.85
1500
20775
31000
1.492178
0.113486
526.9635
13.59887
2402500
13888041114
0.000172991
Hi to Halyal
2
513
14.99951
527.9995
1500
22499.26
31000
1.377823
0.096758
528.0963
14.70541
2402500
18075118504
0.000132918
Hi to Halyal
3
513
18.13761
531.1376
1500
27206.42
31000
1.139437
0.066173
531.2038
17.70934
2402500
33841666231
7.09924E-05
Halyal
4
513
18.63579
531.6358
1500
27953.68
31000
1.108977
0.062683
531.6985
18.18396
2402500
37005258513
6.49232E-05
Ha to Kudichi
1
514
17.69
531.69
1500
26535
31000
1.168268
0.069564
531.7596
17.28237
2402500
31163803478
7.70926E-05
Ha to Kudichi
2
514
17.93614
531.9361
1500
26904.2
31000
1.152236
0.067668
532.0038
17.51721
2402500
32617361148
7.36571E-05
Ha to Kudichi
3
514
20.16269
534.1627
1500
30244.03
31000
1.024996
0.053548
534.2162
19.63483
2402500
47973954566
5.00793E-05
Ha to Kudichi
4
514
20.28896
534.289
1500
30433.44
31000
1.018616
0.052884
534.3418
19.75456
2402500
48971074033
4.90596E-05
Ha to Kudichi
5
514
20.43942
534.4394
1500
30659.14
31000
1.011118
0.052108
534.4915
19.89717
2402500
50177890793
4.78797E-05
Ha to Kudichi
6
514
21.93548
535.9355
1500
32903.22
31000
0.942157
0.045243
535.9807
21.31216
2402500
63321530629
3.79413E-05
Kudichi
7
514
22.06403
536.064
1500
33096.05
31000
0.936668
0.044717
536.1088
21.43349
2402500
64551428193
3.72184E-05
Ku to Diggerwadi
1
515
21.1
536.1
1500
31650
31000
0.979463
0.048896
536.1489
20.52263
2402500
55720799527
4.31168E-05
Ku to Diggerwadi
2
515
18.4081
533.4081
1500
27612.15
31000
1.122694
0.064243
533.4723
17.96711
2402500
35535021635
6.76094E-05
Old Diggerwadi
3
515
22.03252
537.0325
1500
33048.79
31000
0.938007
0.044845
537.0774
21.40375
2402500
64248442481
3.73939E-05
Odigg to Shaharpur
1
518
19.07
537.07
1500
28605
31000
1.083727
0.059861
537.1299
18.59714
2402500
39925209003
6.0175E-05
Odigg to Shaharpur
2
518
18.28779
536.2878
1500
27431.68
31000
1.13008
0.065091
536.3529
17.85248
2402500
34774728701
6.90875E-05
Odigg to Shaharpur
3
518
20.82552
538.8255
1500
31238.27
31000
0.992372
0.050194
538.8757
20.26287
2402500
53368658600
4.50171E-05
Odigg to Shaharpur
4
518
20.95507
538.9551
1500
31432.6
31000
0.986237
0.049575
539.0046
20.38549
2402500
54470062005
4.41068E-05
Odigg to Shaharpur
5
518
20.4062
538.4062
1500
30609.3
31000
1.012764
0.052278
538.4585
19.86569
2402500
49909668881
4.8137E-05
Odigg to Shaharpur
6
518
22.24491
540.2449
1500
33367.36
31000
0.929052
0.043993
540.2889
21.60413
2402500
66309785175
3.62315E-05
Shaharpur
7
518
21.95927
539.9593
1500
32938.91
31000
0.941136
0.045145
540.0044
21.33462
2402500
63547918465
3.78061E-05
Shr to Narsobawadi
1
520
20
540
1500
30000
31000
1.033333
0.054423
540.0544
19.48052
2402500
46710145436
5.14342E-05
Shr to Narsobawadi
2
520
20.58238
540.5824
1500
30873.56
31000
1.004095
0.051387
540.6338
20.03262
2402500
51343408894
4.67928E-05
Narsobawadi
3
520
21.00228
541.0023
1500
31503.41
31000
0.98402
0.049353
541.0516
20.43017
2402500
54875300863
4.37811E-05
Nar to Ankali
1
525
16.05
541.05
1500
24075
31000
1.287643
0.084507
541.1345
15.71373
2402500
22603927480
0.000106287
Nar to Ankali
2
525
17.57806
542.5781
1500
26367.09
31000
1.175708
0.070453
542.6485
17.17551
2402500
30517870081
7.87244E-05
Ankali
3
525
19.73213
544.7321
1500
29598.19
31000
1.047361
0.055911
544.788
19.22629
2402500
44679824606
5.37715E-05
Ank to Sangli
1
528
16.78
544.78
1500
25170
31000
1.231625
0.077314
544.8573
16.41279
2402500
26179363339
9.17708E-05
Ank to Sangli
2
528
15.10021
543.1002
1500
22650.32
31000
1.368634
0.095472
543.1957
14.80219
2402500
18479153396
0.000130011
Sangli
3
528
18.03571
546.0357
1500
27053.56
31000
1.145875
0.066923
546.1026
17.61218
2402500
33218529079
7.23241E-05

Saturday, February 5, 2011

EXPERTS WANTED POLAVARAM AS A BARRAGE AND NOT A DAM

Polavaram As a barrage under BACHAWAT TRIBUNAL AWARD
CHAPTRER VII OF KRISHNA WATER DISPUTES TRIBUNAL AWARD OF BACHAWAT TRIBUNAL
TECHNICAL DEFINITIONS OF  A DAM AND A BARRAGE :
1. Storage structure, usually a dam, which acts like a reservoir for storing excess runoff of a river during periods of high flows (as during the monsoons) and releasing it according to a regulated schedule.
2. Diversion structure, which may be a weir or a barrage that raises the water level of the river slightly, not for creating storage, but for allowing the water to get diverted through a canal situated at one or either of its banks. Since a diversion structure does not have enough storage, it is called a run-of-the river scheme. The diverted water passed through the canal may be used for irrigation, industry, domestic water needs or power generation.
See website:
http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT%20Kharagpur/Water%20Resource%20Engg/pdf/m4l01.pdf
Diversion of the Godavari waters to the Krishna (Issue VI)
see web site:http://www.irrigation.ap.gov.in/volume1.pdf [see pages 66 to 70]
Pleadings.—In their statements of case both Maharashtra (1) and Mysore(2) prayed for a direction that the waters of the river Godavari be diverted to the Krishna. Maharashtra contended that this diversion would help to meet, partly or fully, the shortage of waters in the Krishna. Since this water shortage had been created by over-appropriations by Andhra Pradesh with evident assistance of the Centre, it was the responsibility of the Andhra Pradesh Government to take up this work of diversion at its own cost and meet its water requirement from its share of the Godavari waters which would come to Andhra Pradesh on equitable apportionment by the Tribunal. Mysore contended that if Andhra Pradesh should require waters in excess of its legitimate share to irrigate vast areas for raising a second or even a third crop, it was open to that State to divert waters from the Godavari, since the Godavari had plentiful waters for such diversion. The necessity for the diversion would appear from the report of the Krishna Godavari Commission and the statement of the Union Minister for Irrigation and Power in the Lok Sabha on the 23rd March, 1963.
Andhra Pradesh opposed the diversion and contended (3) that the dispute was not a "water dispute" within the purview of the Inter-State Water Disputes Act. Andhra Pradesh contended that it was for Andhra Pradesh to consider whether it should augment its supplies in the Krishna by diversion of its share of the Godavari waters if its share of the Krishna waters fell short of its commitments and that this matter did not concern the other two States.
Issue.—The following issue ( Issue VI) was raised.—
"Is it possible to divert waters from the river Godavari to the river Krishna ? Should such diversion be made and, if so, when, by whom, in what manner and at whose cost ? Is the Tribunal competent to adjudicate on these questions ?"
Order of the Tribunal.—On April 19, 1971, the Tribunal passed an Order in terms of the following agreed minutes filed by Counsel for the States of Andhra Pradesh, Maharashtra, Mysore, Madhya Pradesh and Orissa :—
"(1) Parties have agreed that each of the States concerned will be at liberty to divert any part of the share of the Godavari waters allocated to it by the Godavari Tribunal from the Godavari basin to any other basin.
(2) In view of the pleadings and the statements of the States concerned, none of the States asks for a mandatory order for diversion of the Godavari waters into the Krishna basin.
(3) All the other contentions of the parties are reserved and will be decided in the Krishna case.
(4) The Krishna case will be decided separately from the Godavari case.
(5) The States of Madhya Pradesh and Orissa are ordered to be discharged from the record of this case and will no longer be parties to this case.
(6) The States of Madhya Pradesh and Orissa will bear and pay their own costs." Clause 1 of the above order was amended by an order passed in terms of agreed minutes filed by the parties on the 27th July, 1971. The amended clause 1 is as follows :—
"Parties have agreed that each of the States concerned will be at liberty to divert any part of the share of the Godavari waters which may be allocated to it by the Godavari Tribunal from the Godavari basin to any other basin." Similar orders were passed in the Godavari case.
Effect of Orders of the Tribunal.—In view of the above orders, the State of Andhra Pradesh is free to divert its share of the Godavari waters to the Krishna river, but it can not be compelled to do so. It is still necessary to consider whether the possibility of the diversion of the Godavari waters to the Krishna or the absence of such diversion affects the equitable share of the parties in the Krishna waters.
Topo-sheet study.—The upper reaches of the Godavari Valley are lower than the corresponding reaches of the Krishna Valley. It is, therefore, not possible to divert, by flow, any waters from the upper reaches of the Godavari into the upper reaches of the Krishna.
The highest suitable point on the Godavari is near Pochampad from where its waters can be dropped into the Nagarjunasagar reservoir on the Krishna. In the lower reaches, there are possibilities of diverting the Godavari waters by a link canal from the Godavari near Albaka to Pulichintala on the Krishna and a link canal from the Godavari at Polavaram to Vijayawada.

Earlier Proposal.—The Ramapadasagar Project of 1951 contemplated diversion of the Godavari
waters by the Polavaram-Vijayawada link canal.(4) The Khosla Committee(5) discussed the possibility of the diversion.


Krishna Godavari Commission.—In 1961, the Krishna Godavari Commission was asked to report on the feasibility of diverting any surplus supplies in the Godavari to the Krishna indicating the quantity to be diverted and the cost involved. After examining this question, the Commission recommended that the shortage in the Krishna basin could be made up partly by the transfer of such surplus supplies from the lower Godavari area as could be utilised in the Krishna basin by the following two link canals :—
(a) A link canal from the Godavari at Polavaram to Vijayawada at a cost of aboutRs. 40 crores. This link canal would transfer about 211 T. M. Cft. of water to the Krishna.
(b) A link canal from the Godavari near Albaka or Singaraddy to Pulichintala on the Krishna at a cost of about Rs. 40 crores. This link canal would transfer about 95 T. M. Cft. of water to the Krishna.
The Commission considered that it should be possible, on the basis of the information contained in their report as well as field reconnaissance and some preliminary surveys to be carried out, to prepare a preliminary project report in about 6 months and establish the feasibility or otherwise and the scope of the proposed diversions from the Godavari to the Krishna. (6)
Later investigations.—As a result of the recommendations of the Krishna Godavari Commission, the work of investigating the diversion of the Godavari waters to the Krishna was entrusted to the Central Water and Power Commission and two Circles were opened, one for investigating the diversion links and the other for measuring discharges at some key stations on the Krishna and Godavari rivers. The Government of India set up the Godavari Krishna Technical Committee to review the progress of work in the two Circles and give suitable guidance to them. The feasibility of the link canals was discussed in four meetings of the Godavari Krishna Technical Committee between 1963 and 1966 and in inter-State meetings held in August and October 1967. No agreement on the subject was reached between the concerned States.
Godavari-Pulichintala link canal.—The Krishna Godavari Commission considered that it might be possible to divert 95 T. M. C. of the Godavari waters annually from this link canal. However, it is no longer contended by Maharashtra and Mysore that this link canal is technically feasible. Accordingly, we are not called upon to consider the possibility of diversion by this link canal.
Polavaram-Vijayawada link canal.—This link canal formed part of the Ramapadasagar Project which was later abandoned. The Polavaram Barrage scheme proposed by Andhra Pradesh consists of a barrage at Polavaram on the Godavari and two canal s. The right bank canal of this scheme would run up to Vijayawada. At the first meeting of the Godavari Krishna Technical Committee, all members agreed that Polavaram would be the best site for the link canal and that since the Polavaram barrage as well as the Vijayawada barrage would have no storage of their own, it would be necessary to have a storage site on the Godavari river upstream of Polavaram to provide the necessary storage for meeting the requirements of both the Godavari and Krishna Delta canals.(7) At the second meeting of the Committee(8) it was decided that the base study for the link canal would be made on the basis that the link canal would take off by a diversion structure from near about Polavaram and would get regulated supplies from a storage higher up or releases from a number of projects high up. At the second, third and fourth meetings of the Committee (9), and at inter-State meetings held in August and October 1967 several storage sites on the Godavari were discussed, but no agreement was reached. Maharashtra has stated that storages at Inchampalli and Ippur at the requisite level are not permissible in view of the extensive submergence of areas in Maharashtra and Madhya Pradesh and that except the Bhopalpatnam and Watra Badruk Projects no other storage for meeting the reasonable irrigation needs of Andhra Pradesh is feasible.(10) This statement is not disputed by Mysore.
Revised Maharashtra Scheme.— In its final statement (11) regarding the Godavari diversion, Maharashtra proposes that for meeting the needs of the Krishna Delta, 146 T. M. C. of the Godavari waters may be diverted by the Polavaram-Vijayawada Link canal from the run of the river supplies and regulated releases of 171 T. M. C. from the Bhopalpatnam storage and 182 T. M. C. from the Watra Badruk storage. The Bhopalpatnam storage on the Indravati river would be a joint project of Madhya Pradesh and Maharashtra and the Watra Badruk storage on the Pranhita river would be a joint project of Andhra Pradesh and Maharashtra. One of the two storages is necessary and sufficient for the diversion scheme. Sufficient surplus supply from Andhra Pradesh's share in the Godavari waters after meeting its reasonable requirements will be available for diversion to the Krishna. The right bank canal of the Polavaram barrage scheme with suitable modifications can serve as the Polavaram-Vijayawada link canal. Mysore generally supports this proposal(12). Andhra Pradesh opposes the proposal(13).
Proposals for Bhopalpatnam and Watra Badruk projects.—
Before the Godavari Water Disputes Tribunal, Madhya Pradesh proposed Bhopalpatnam Project Stages I and II as a joint project of Madhya Pradesh and Maharashtra(l4). The note on the Project stated that the proposal was based on topo-sheets and that field investigations were being undertaken. Maharashtra supported the proposal (15) The Project would submerge large areas in the territories of both Madhya Pradesh and Maharashtra. Before the Godavari Water Disputes Tribunal, Andhra Pradesh proposed the Watra Badruk (Pranhita) Project and stated that it would be for the mutual benefit of Maharashtra and Andhra States if the project was taken up as a joint venture. (16) Andhra Pradesh stated that detailed investigation of the scheme was in progress.
The project would submerge large areas in the territories of both Andhra Pradesh and Maharashtra. Maharashtra supported the proposal. (17) There is no material before the Tribunal to show that the field investigations have been completed. No joint project report of either the Bhopalpatnam Project or the Watra Badruk Project has been filed before the Tribunal.
After the project reports are prepared, joint cost-benefit schemes will have to be finalised and it will be then for the States to consider whether any of the joint projects is feasible or advantageous. It is not possible at this stage to say that Maharashtra and Madhya Pradesh will enter into an agreement for the undertaking of the joint BhopalpatnamProject or that Andhra Pradesh and Maharashtra will enter into an agreement for the undertaking of the joint Watra Badruk Project. In the absence of an agreement, there cannot be a joint project or storage either at Bhopalpatnam or Watra Badruk. One of the two storages is necessary and essential for the diversion scheme proposed by Maharashtra. On the present materials it is not possible to say with certainty that either of the two storages will be available in the near future.
Possibility of Godavari diversion and equitable apportionment of the Krishna waters.—It may be that sooner or later either the Bhopalpatnam Project or the Watra Badruk Project may materialise and in that event the scheme for diversion Of the Godavari waters to the Krishna river for meeting a part of the requirements of the Krishna Delta Canals can be carded out. But the remote possibility of diversion of the Godavari waters to the Krishna is not a sufficient ground now for cutting down the allocation of an equitable share of the Krishna waters to Andhra Pradesh for meeting its needs.
Maharashtra argument regarding equities.—Maharashtra argues that in view of the statement of the Union Minister for Irrigation and Power in the Lok Sabha on the 23rd March, 1963 and other statements of the Union Government regarding diversion of the Godavariwaters into the Krishna, equities have arisen in favour of Maharashtra and Mysore and that if the diversion of the Godavari waters to the Krishna does not materialise, the allocations for Nagarjunasagar and Srisailam Project of Andhra Pradesh should be suitably cut down and modified. We are unable to accept this contention for the following reasons:—
In his Lok Sabha speech on the 23rd March, 63, (18) the Union Minister for Irrigation & Power said that Nagarjunasagar Stage it could be cleared only after investigations on Godavari supplies would be completed. He did not say that in the absence of the Godavari diversion the sanctioned Nagarjunasagar Project (Stage I) would be modified. Nagarjunasagar Project was undertaken in 1955 and its sanction was not dependent on the availability of supplies from the Godavari.
The Union Minister stated that Srisailam Project should be suitably modified after taking into account the requirement of 264 T. M. C. for Nagarjunasagar Project, the possibility of diversion of the Godavari waters and inflows between Srisailam and Nagarjunasagar. Suitable action was taken on this statement. On March 26, 1964, Srisailam Project was sanctioned by the Planning Commission. (10) The sanction was on the basis of ultimate water release of 180 T. M. C. from Srisailam. The preliminary sanction letter of June 7, 1963 and the letter and note of Planning Commission dated July 5, 1963 (20) pointed out that even on the assumption that the Godavari diversion would materialise, it could be safely assumed that the minimum release for power generation from Srisailam would be 180 T. M. C. annually. If there is no diversion of the Godavari waters into the Krishna, it will be necessary to release more than 180 T. M. C. annually
from Srisailam to meet the requirements of Nagarjunasagar Project and Krishna Delta Canals. The sanctioned Srisailam Project is not dependent or conditioned on the availability of additional supplies in the Krishna from the Godavari diversion.
On March 23, 1963, the Union Minister also stated that pending final allocation of waters, Maharashtra, Mysoreand Andhra Pradesh should withdraw respectively 400 T.M. C., 600 TM C and 800 T. M. C. of supplies from the Krishna. At a meeting between the representatives of Maharashtra and Union Governments on April 22, 1963(21). Shri S. B. Chavan, Minister of Irrigation &Power, Government of Maharashtra said that it was not clear on what basis the withdrawals had been allowed. Shri.Hafiz Mohammad Ibrahim, Union Minister for Irrigation and Power stated that the withdrawals indicated by him were only estimates and were not in any way final allocations. Shri M. R. Sachdev, Secretary to the Government of India, Ministry of Irrigation and Power stated that sizeable surpluses would be available for further allocation to Maharashtra and Mysore as a result of diversion of the surplus waters of the Godavari to the Krishna but the quantum would be known after the investigations would be completed.
Shri C. L. Handa, Member, Central Water and Power Commission stated that additional supplies would be available as a result of diversion of the surplus waters of the Godavari estimated at 300 T. M. C. by the Gulhati Commission, and from regeneration or salvage of irrigation flows ; but he could not say how much of the additional supply would be available to Maharashtra. Shri O. V.Alagesan, Minister of State, Irrigation & Power said that 300 T. M. C. as a result of the Godavari diversion and 300 T. M. C. as a result of regeneration or salvage i.e. in all 600 T.M.C. would be available and the allocations had been made on that basis. Shri Handa stated that the surpluses on account of regeneration and salvagecould not be quantified. Shri B. Y. Barve, Minister of Finance, Government of Maharashtra stated that, according to Maharashtra, hardly any further supplies in addition to the withdrawals of 400, 600 and 800 T. M. C. indicated in the Union Minister's statement would be available for allocation from the Krishna. No definite assurance was given to Maharashtra by the Union Government that investigations regarding the Godavari diversion had been completed and such diversion was technically feasible,or that any portion of the additional supplies in the Krishna from the diversion would be available to Maharashtra, nor did Maharashtra act upon such an assurance. No representative of Andhra Pradesh was present at the meeting. Our attention was not drawn to any other statement of the Union Government in this connection.
Andhra Pradesh made no representations concerning Godavari diversion for which it can be saddled with any equities in favour of Maharashtra and Mysore. The States of Maharashtra and Mysore submitted that in the event of diversion of the waters of the river Godavari to the river Krishna, there should be a self-executing order providing for equitable distribution of such waters.
Alternatively, they submitted that in the event of augmentation of the water of the river Krishna by the diversion of the waters of the_ Godavari, the Ganga or any other river, liberty should be reserved to them to claim the benefits of the diverted waters. The State of Andhra Pradesh strongly disputed these claims. The question whether the States of Maharashtra and Mysore should be given any share in the" diverted waters will require examination if and when the waters of the river Godavari or any other river are diverted into the river Krishna. We are providing for review of our final order after the 31st May, 2000. We are inclined to think that all the States should be at liberty to urge their respective contentions before the reviewing authority after the 31st May, 2000 and not earlier. Accordingly, we propose to pass the following order :—
"In the event of the augmentation of the waters of the river Krishna by the diversion of the waters of any other river, no State shall be debarred from claiming before the aforesaid reviewing authority or tribunal that it is entitled to greater share in the waters of the river Krishna on account of such augmentation nor shall any State be debarred from disputing such claim". Issue VI is answered accordingly.
         Part -II Why Many  Genuine Experts Wanted Polavaram As a Barrage and not as a risky Dam .
 In the case of Polavaram dam project almost all the people including the so called experts are not at all interested in taking a  comprehensive view of the several  Socialogical,technical,economic,legal and environmental  including even tthe safety aspect of the project. Some of the crucial points are presented here in a chronological order to identify the different vested interests that influenced the course of events resulting in prolonged legal battles in different courts and public agitations that demanded  for better alternative Schemes taht are ,safe,technically feasible ,economically viable and socially acceptable
Old Generation of Government Experts proposed a Barrage or a Concrete Dam but not a risky Earth- Rockfill Dam at Polavaram  for Diverting Godavari Surplus waters into Krishna  river SEE
http://www.irrigation.ap.gov.in/volume1.pdf  [study  pages 66 to 70 of Chapter VII on Godavari Water Diversion  into krishna basin by a b arrage and  detailed and reasoned answer provided to ISSUE VI by Bachawat Tribunal during 1979-1980 as Maharashtra and Karnataka were agitating for more of krishna water  by diversion of Godavari flood waters into krishna river basin ]

During 1850’s Sir Arthor Cotton suggested for a barrage at Polavaram:   
Sir Arthor Cotton was  a great humanist and a friend of the farmers wanted maximum utilization of Godavari waters for augmenting agriculture and suggested that in order to irrigate the uplands of East and West Godavari districts. Another anicut must be constructed on the upstream side of Rajahmundry. Because he was a great Irrigation Engineer with humanistic outlook and great vision he knew that it will be a highly dangerous to propose a major water storage dam in the close proximity of growing townships like Rajahmundry which may be adversely affected due to collapse of such a major storage dam for one reason or the other. Hence Sir Arthor Cotton suggested for an anicut to irrigate more lands in the upland areas of Easternghats in East Godavari and West Godavari districts.

In 1945, Madras Government proposed a high concrete dam at Polavaram site :    Madras Presidency Government proposed a major reservoir project across Godavari before independence and it was known as Ramapada Sagar project with a height of 198ft. in the first phase to raised to 208ft. in the final phase with a storage capacity of 690 TMC. This was proposed as a concrete dam with a total height of 438ft. upto the foundations with sand bed extending for a depth of about 230ft. below the bed level. The spillway was provided for a length of 4200ft for a peak discharge of 21 lakh cusecs. Since concrete dam had to be taken upto the bedrock for its safety the cost of the project became too high and hence the high cost factor made the dam not all feasible and hence it was given up.

In 1953 Khosla Technical Committee sugested for a Barrage at Polavaram site: The Government of India appointed a high power technological committee under the chairmanship of Dr.A.N.Khosla, Chairman of the Central Water Commission (CWC) to study and submit report on the optimal utilization of water in Krishna-Godavari and Pennar rivers. This committee stated that there is a possibility of diverting Godavari water by constructing either a dam or a diversion barrage with a canal to transfer 142 TMC into Krishna river. The Committee further stated that if Ramapad Sagar dam is not built but a storage reservoir is constructed upstream on Godavari or its tributaries and only a diversion barrage is built at Ramapadsagar dam site the transfer of 142 TMC of water into Krishna river will remain unaffected.

In 1961 AP State Government Suggested for a Barrage at Polavaram site: In a technical report by the AP State Government prepared a 1961 on the optimum economic utilization of Krishna and Godavari waters the state Government recommended for construction of a barrage at Rampad Sagar site and a dam at Inchampalli to divert Godavari waters into Krishna rivers in Para 23 of the Report in the following words.

“The only practical scheme for diversion of Godavari waters to Krishna basin the lower reaches is by construction of Inchampalli dam and Rampad Sagar barrage. By this it will be possible to divert waters at less cost than the previous proposals (made by Maharashtra state Government) as the tunnels are eliminated and length of the canal reduced. But this itself is very costly as commented upon by the technical committee (Khosla committee) who stated that with a small quantity of water for diversion the economics of the proposal becomes problematic.

In 1962 the Technical Committee headed by Gulhati suggested for a barrage at Polavaram site: The Ministry of Irrigation and Power, Government of India appointed in a technical commission in May 1961 to study and submit a report on the utilization of Krishna and Godavari waters including the feasibility of diverting Godavari waters into Krishna river and the committee submitted its report in August 1962. This Commission was headed by an eminent engineer Mr.Gulhati along with other highly technically qualified experts as members. The Commission in its report stated that there will be ample surplus water in the upper part of the Godavari basin to meet the demands of thelocal projects and the surplus water from the lower part of the Godavari basin including the sub basins of Pranahita, Indravati and Sabari can be used for irrigation and hydro-power projects will be more than 10 MAF (435 TMC) and this surplus flow can be diverted into Krishna basin by the following 2 link canals.

1. A link canal from the Godavari from the anicut at Albaka (or Singareddi) to Pulichintala on the Krishna river, estimated at Rs.40 crores. This link canal can transfer about 95 TMC (2.2 MAF) to the Krishna.

2. A link canal from Godavari near Polavaram can transfer about 211 TMC (4.8 MAF) into Krishna river at Vijayawada estimated at Rs.40 crores about 30 TMC from Penganaga can be transferred through a link canal to make up the shortage of water in the Upper Godavari area.

In 1965 a technical Committee headed by Mr.A.C. Mitra suggested a barrage at Polavaram site: The Government of India appointed an expert committee in the wake of recurring floods in Godavari and Krishna rivers which were causing excessive flooding of the Kolleru lake to study the impacts of floods and suggest remedial measures. This technical committee headed by an eminent irrigation expert Mr.A.C.Mitra along with other irrigation experts recommended for the construction of a barrage at Polavaram for irrigating the upland areas on either side of the barrage.

Rampad Sagar  Reservoir is so named for the reason that the waters of the reservoir will lap the feet of Srirama at the Bhadrachalam temple, 74 miles above the proposed dam near Polavaram village.  This Concrete Dam was intended to irrigate 24 lakhs of acres with Paddy cultivation in addition to stabilizing irrigation in 21 lakh acres in Godavari and Krishna delta and will yield a million tonnes of rice that  will eliminate all the pre-war imports of rice from Burma and Travancore. Hydro-power of 75000KV and the projected was expected to be completed by the end of 1946.  Project cost was Rs.63 crores. The net return is 3.7% per annum on the net capital  outlay.Rock was below 200 ft. and it proved uneconomical and posed difficulties and was given up

In 1970 AP State Engineers proposed a big reservoir at Polavaram  but designated it as a barrage : AP State submitted Polavaram barrage scheme in June 1970 to the Bachawat Tribunal. This scheme consists of a barrage across Godavari at Polavaram with FRL at +145ft. and minimum pond level at +45ft with Left Bank Canal upto Vizag Port with Full Supply Level with (FSL) at +137ft and Right  Canal upto Krishna river with FSLat +138ft. Safe Concrete Dam was replaced  by a risky Eart-cum-rock fill dam

In 1978 AP State Engineers proposed a hazardous  earth-cum-rockfill dam at Polavaram site:      AP state changed the Polavaram barrage scheme into an earth-cum-rockfill dam with a maximum height of 48.77m (160ft) with a crest length of 1555m (5100ft) . It had 2 spillways on the right flank sadal with 50 radial gates (50ft. x 42ft) with a flood lift of a 14ft. for peak design flood of 36 lakh cusecs. It had a concrete gravity dam on the left flank with Power house and river sluices. The earth dam is 35.05m (115ft) above the average river bed and 48.77m (160ft) above the deepest bed level of the river. This height for the dam is stated to be necessary for diverting the required quantity of water into the canals which proposed to irrigate vast areas on both the flanks. The MDDL and FRL stated to be required are +44.2m (145ft.) and RL +47.72m (+150ft) respectively with gross storage capacity of 5665 Mm3 (192 TMC) The storage available between the minimum draw down level and FRL (44.20m to 45.72) is only 800 Mm3 (28.31 TMC). The project serves 4.82 lakh ha. (11.90 lakh acres) of Ayacut during Kharif (June to October) and 2.27 lakh ha (5.6 lakh acres) under second crop (Jan to April) in the ultimate stage. The left canal, 208kmlong upto Visakhapatnam and it serves industrial needs and irrigates 1.89 lakh ha under first crop and 1.25 lakh ha. under second crop in East Godavari and Visakhapatnam. A lift irrigation canal starts at Km 177 near Anakapalli, 130km long irrigates 1.15lakh ha in Visakhapatnam and Srikakulam. Another lift canal, 177km long starts at Polavaram to serve upland areas of 0.57 lakh ha under first crop and 0.2 lakh ha under second crop in East Godavari and Visakhapatnam districts. The right main gravity canal 176km long upto Budameru river irrigates 1.21 lakh ha. under first crop and 0.80 lakh ha. under second crop in West Godavari and Krishna distrits.

In August, 1978 AP State made a conditional Agreement with Karnataka on Polavaram dam: On 4-8-1978 an agreement was signed between Karnataka and AP State under which clause-VII states that under the condition that clearance to Polavaram project is given by CWC for FRL/MWL of +150ft. MSL. AP State agrees to divert 80 TMC into Krishna for utilization by projects upstream of Nagarjuna Sagar by allotting share of 45 TMC to AP State and 35 TMC to both Karnataka and Maharashtra. Another condition is that AP Sate submits Polavaram project to CWC within 3 months of striking an agreement with all the 5 river basin states and that AP state will bear the full cost of this water diversion and if this quantity diverted is exceeded the water will be shared in the above stated proportion. Surprisingly while the Karnataka state Government which has no adverse impacts due to Polavaram project has taken the initiative to fix the height of the Polavaram dam the most effected states of Madhya Pradesh and Orissa were left with the option of deciding to agre on the crucial matter on submersion of lands in their states. Andhra Pradesh made agreements with Madhya Pradesh on 7-8-1978 and Orissa on 15-12-1978 on the issue of submersion of lands due to Polavaram project with the condition that including backwater effect. The design of the Polavaram project should be such that the submersion should not exceed +150ft MSL at Konta in Madhya Pradesh and Motu in Orissa due to maximum Probable Flood and backwater effects determination in consultation with Central Water Commission.

July, 1979: CWC finds fault with AP State for a faulty agreement on Polavaram: The CWC sent letter No.6/125/78-T.E/25 12-2514, dated the 3rd July, 1979 to Andhra Pradesh Government, the material portion of which is as follows:-

“It is seen from the project report that the State Government of Andhra Pradesh have proposed the Polavaram project for an FRL/MWL of +150ft. Therefore, prima facie, with MWL at Polavaram at RL +150ft. submergence due to all effects including that of backwater effect will always be more than RL+150ft upstream and also at Konta. The Stte Government will no doubt be working out the backwater effects at Konta/Motu considering advance releases from polavaram dam. It is however seen that during the year 1966 CWC had observed that a flood level at Konta had reached an RL 46.595m (RL 152.88ft) which is 0.875m higher than RL 45.72m (RL+150ft) This is an observed flood whose frequency is expected to be high. For a flood at Konta corresponding to frequency the flood adopted for the Polavaram dam (which will be between 1 in 500 years to 1 in 1000 years), the natural flood level at Konta should be expected to be substantially higher than RL +45.72m (RL +150ft) It would thus be een that the stipulation that a flood level at Konta/Motu should not rise above RL +150ft will not be practicable and that the agreements entered into by the states may have to be suitably modified. Perhaps this situation about observed flood level at Konta might not have been known to you and other states when this agreement was concluded.

In October 1979 Maharashtra supports the conditional agreement on Polavaram dam:                   On 15-10-79 the Maharashtra state Government took a very cantankerous cold blooded and brutal stand on the Polavaram dam project by demanding the Bachawat Tribunal to consider the agreement of 4th August 1978 between AP state and Karnataka as a practicable one and to consider the temporary submergence in Orissa and Madhya Pradesh preventable by constructing and maintaining protective embankment in the interests of Justice and for securing most equitable allocation of waters in the Godavari river.
Consequently Maharashtra wanted the tribunal to incorporate and give effect to clause VII in Karnataka Government in its report under Sec 5(2) and pass the required order and thereby implying that the tribunal must permit for the construction of Polavaram dam with FRL at +150ft irrespective of any disastrous consequences and at any cost.
 Madhya Pradesh disagrees with the contention of Maharashtra:
This Maharashtra petition was circulated to other basin states for replies. Karnataka did not file any reply. Andhra Pradesh submitted the tabulated statement of backwater level for the pre and post project conditions for 30 lakhs and 36 lakhs cusecs flood. AP wanted FRL 150subject to the safeguards regarding flood protection works. Madhya Pradesh disagreed with views of Maharashtra.
Orissa insists on integrated water resources planning for projects at Inchampalli and Polavaram:
Orissa stated that Polavaram and Inchampalli projects are closely interlinked because Polavaram project is dependent on the releases from Inchampalli Hydro-Power plant and the FRL and MWL of Polavaram depend upon the FRL and MWL of Inchampalli project and its spillway discharge capacity and the pattern of releases from Inchampalli and both these projects would be so palnned that the submergence in Madhya Pradesh and Orissa would not exceed +150ft due to all causes. Orissa rejected the arguments of Maharashtra on Polavaram project while Karanakata though did not file a reply yet it tried to support the arguments of Maharashtra.

The raise in elevation of the surface profile of a river when the flow is retarder above a dam is referred to as the backwater effect of the dam. It is the excess submergence over and above that by natural floods as caused by the backwater effects due tos the Polavaram dam that is to be avoided or minimized as far as possible. But the correct backwater effect or backwater level due to Polavaram dam must be determined by the CWC as per para 110 of the Bachawat Tribunal report.

The tribunal under chapter-2 of the final report dt.7-7-1980 under sec 5 (3) and Paragraph 12 the tribunal left the matter for the clearance of the Polavaram project to the CWC after making the following observations


“The CWC will naturally keep all these points in view while clearing the Polavaram project in consultation with the concerned parties, after giving due consideration to achieve the objectives mentioned in the project reports of Andhra Pradesh. The tribunal however, on its part does not find any difficulty for clearing the Polavaram project at FRL/MWL +150ft.

AP State Proposes Embankments to Prevent submersion in Upper States and insists on conditions:
On 26-10-1979 AP state agreed to prevent temporary submersion due to the dam by constructing and maintaining protective embankments. The AP also stated that there can be no question of diversion of Godavari waters into Krishna unless Polavaram project is cleared for FRL +150ft and subject to such safeguards as the tribunal may provide so as to give effect to all the agreements without detriment to any of the parties (Para 123 of the Tribunal report)

1980: During the President rule in Orissa, a middle level engineer was deputed on behalf of Orissa state government to sign on agreement along with AP and Madhya Pradesh and Central government on Polavaram project. The Government of India gave in writing on 26-3-1980 that Polavaram dam with FRL at +150ft. is technically feasible.But Environmental safety was ignored

In the final submissions before the Bachawat Tribunal the AP State Government demanded on 25-2-1980 the tribunal that since both the upper states have agreed for permanent submersion of their lands upto +150ft the tribunal may permit submersion of lands in Orissa and Madhya Pradesh upto 175ft but it is not accepted because submersion had to be prevented by construction of embankments as suggested by the Central Water Commission with adequate pumping arrangements and drainage sluices.
Thus the interstate agreement envisaged that AP state will submit proposals for Polavaram dam within 3 months of the agreement made by all the 5 river basin states so that the CWC will clear the project as expeditiously as possible to enable the state Government to complete the project in time.Because of the Delay of the project by 25 years,all the legal and environmental hurdles have cropped up such as increse of peak floods from 36 to 50 lakhs cusecs and the consequential increse in submersion levels in upper states,making Bachawat Award conditions invalid

30-4-1983: Dr.K.L.Rao warned that Polavaram dam is under-designed and is unworkable. He expressed strong opposition to the Dam because of various reasons like under-designed spillway for the higher levels of peak floods expected to occur in the near future.see annexure below for more details on defective designs

Tuesday, February 1, 2011

URGENT GODAVARI FLOODS UTILISATION TO SAVE FARMERS

http://tshivajirao.blogspot.com/2011/01/godavari-water-utilisation.html
The second Krishna Water Disputes Tribunal  headed by Brijesh Kumar conferred legal sanctity and support to the  large scale Krishna river water diversions by Karnataka and Maharashtra  in violation of the Bachawat Award.   The Tribunal reduced the 75% dependability of river water to 65% dependability and thereby increased annual dependable water for the upper states by violating the traditional norms.   Thus Telangana, Rayalaseema and Coastal Andhra cannot any more depend upon the Krishna waters for sustaining the existing  irrigation projects in the AP State and that too after the tribunal ordered for increase the height of the Alamatti dam.  But since the AP State Government has the responsibility to prevent the ever growing farmers suicides due to the irrigation water scarcity immediate action must be taken to save the farmers and farm workers by providing water from alternative sources like Godavari waters including the flood water for the following reasons.
  1. Godavari water utilization can be considered to be more dependable because the upper states have not so far attempted to utilize their allotted share of water of at least 1000 TMC during the last decades particularly because of the unfavourable conditions like deep forests and steep mountain ranges. 
  2. Moreover due to climate change the Godavari catchment areas are likely to receive annually about 20 to 25% additional rainfall due to increased intensity and duration of the depressions and cyclones in the Bay of Bengal. 
  3. Even today the Inchampalli project is treated as a ill-conceived project as it is intended to produce 970 MW hydro-power and utilize only 85 TMC for cultivation of 7 lakh acres of paddy during Kharif season for the reason that the tail race waters are needed for delta irrigation and Polavaram projects.  This stand of the Government is wrong because at least 1000 TMC is available below Inchampalli due to the difference in the 75% dependable water supplies of 2860 TMC at Dowlaiswaram and 1550 TMC  at Inchampalli and this water is enough to take care of the irrigation needs under Godavari delta and other projects.
  4. All the available water of Godavari river at Inchampalli can be utilized for large scale hydro-power generation and irrigation of agriculture fields in Telangana and also transfer additional flood water for irrigation in Krishna delta, Rayalaseema and Tamil Nadu. 
  5. With the additional water supply to Tamil Nadu the water saved thereby in the Cauvery basin can be allotted to Karnataka state so that the Karnataka Government can transfer irrigation water from upper Bhadra and Alamatti to feed the upland areas of Anantapur, Cuddapah and Chittoor  districts including the uplands of Mahaboobnagar.
  6.  Instead of allowing about 2000 TMC of Godavari waters flow into the sea every year, a fraction of such water can be used to irrigate about 67 lakhs of acres in the AP State including 12 lakh acres of Kharif paddy in Rayalaseema,  30 lakhs acres of Kharif paddy and 25 lakhs of irrigated dry crops during Rabi totaling 55 lakh acres in Telangana region. 
  7. As there are 2 major dams on Krishna at Srisailam and Nagarjuna Sagar similarly Telangan region can have 2 such large dams one at Suraram in Mahadevpur taluk with FRL at +135m and another dam at Eturunagaram with FRL at +105m with a combined live storage of about 550 TMC However the proposed project at Inchampalli must be given up.  It must be remembered that the difference between 50% and 75% dependable river flows is as large as 1000 TMC in case of Godavari as against only 260 TMC in the case of Krishna river and such flows also can be utilized by constructing large reservoirs on Godavari.
  8. In the case of Godavari large scale flows are available in the 3 months of July, August and September while the flows in October are quite meager and they can be fully utilized by the upper states even without any large storage dams.  As such the magnitude of storage of Godavari water upto the end of September month determines the extent of irrigation under the first and second crops in Telangana, coastal delta and Rayalaseema region. 
  9. However various irrigation schemes in Rayalaseema can have assured irrigation water only when Krishna delta is provided with Godavari waters and about 150 to 200 TMC thus saved at Srisailam can be utilized to irrigate about 12 lakh acres of paddy in Rayalaseema during the Kharif season and for this purpose Pothireddypadu comes in handy. 
  10. Thus there is no scope for irrigated dry during Rabi season for obvious reasons like non-availability of Godavari waters for diversion unless the storages for Karnataka are utilized for this purpose.
  11. Under the lower down reservoir above Eturunagaram the entire dam lies in Andhra Prdesh only FRL +105m against FRL +112.77m at Inchampalli submersion in Madhya Pradesh gets reduced substantially with negligible submersion in Maharashtra for  live storage capacity of about 300 TMC. 
  12. Even at reduced FRL +95m as proposed at Inchampalli in order to get immediate sanction, capacity will be about 150 TMC against only 40 TMC at Inchampalli foundation will be for the ultimate FRL +105m. 
  13. About 90% of the annual yield in small streams and minor rivers and about 80% of the total yield in major rivers is on account of flood flows that occur in 4 months from July to October of the monsoon season.  Even for control of floods there is no alternate except to build big reservoirs because bigger the reservoir, more the moderation of the natural flood.
  14.  Even assuming that the upper states utilize 100 TMC per month during the rainy season covering July to October. AP state can utilize upto 1500 TMC including its unutilized share of about 760 out of 1480 TMC allotted by the Tribunal . 
  15. The proposal of NWDA to construct Inchampalli with FRL at +95m with a live capacity of 40 TMC and a gross capacity of 60 TMC is not helpful as small barrages are not useful for flood control. 
  16. Lift irrigation is unavoidabale to provide irrigation for Telangana lands which are located at high elevation.  Since the maximum flood level at the Railway bridge on Godavari is at +138.m neither Mancherial nor Ramagundam will be effected.  Flood production bunds can be provided for Manthani and a few villages and one or two towns can be shifted to higher ground. 
  17. Submersion in Maharashtra will be about 20,000 ha. under the upper dam.  The lower dam at FRL+150m will be entirely in Andhra Pradesh with a submersion for both the reservoirs works out to about 45,000 ha. as against 57,000 ha contemplated under Inchampalli project as anticipated under the interstate agreement. 
  18. Bigger dams will have lesser submersion per 1 TMC of water stored. While one lakh acres were submerged for 20 lakh acres irrigation under Nagarjunasagar, about 100 acres will be submerged for irrigating about 200 acres will be usually submerged under minor irrigation tanks and hence Bigger dams with large reservoirs must be preferably located in the upper reaches of a major river. 
  19. The cost of this project was estimated at Rs.40,000 crores during the year 2000 and its cost has to be revised with suitable modifications irrigation can be extended upto 100 lakh acres under these 2 dams. 
  20. Further about 150 to 200 TMC OF Godavari flood waters can be offered during July to September for Tamil Nadu and for consequential utilization of additional Cauvery waters by Karnataka which inturn can supply water for irrigating the upland areas of Rayalaseema and Telangana. 
This project must be taken up as an interstate project and it should be developed under a corporation with the joint cooperation of Karnataka, Tamil Nadu, Andhra Pradesh and the Central Government and should be funded by international funding agencies non-resident Indian and the government of India including the water users in all the concerned states.  This project must be taken up immediately so that the problems of water scarcity for drinking, irrigation, hydro-power generation can be solved within a shorter time without exposing the people to the unavoidable problems of water famine, food famine, unemployment and the consequential social unrest.
INEFFECTIVE IRRIGATION PROJECTS OF JALAYAGNAM DUE TO DWINDLED  WATER  ALLOCATION UNDER THE SECOND KRISHNA TRIBUNAL AWARD:
A.P. State Government proposal on Jalayagnam covers 74 irrigation projects to provide irrigation for more than one crore acres at a cost of over Rs.1.50 crores.  If the projects have to provide sustainable irrigation and food production in Rayalaseema and South Telangana they must provide 75% dependable water from Krishna water and should not depend on sole krishna flood flows which occur once in about 6 years when there are abnormal  floods due to extreme rains and cyclones.  Some of the projects need dependable river water in Thousand Million Cubic ft. (TMC)  of 30 for Srisailam Left Bank Canal, 25 for Kalwakurti lift, 20 for Bhima lift, 30 for Nettempadu lift, 34 for Telugu Ganga , 38 for Galeru-Nagari, 40 for Handri-Neeva lift, 19 for Srisailam right canal , 16 for Gandikota, 10 for Mylavaram, 4 for Owk, 10 for KC canal. Potireddypadu capacity has been wided from 11,500 to 44,000 cusecs to draw 120 TMC of krishna surplus flows and flood flows within 30 days from Srisailam.  About 112 TMC of Krishna surplus is proposed to be drawn within 30 days for Telugu Ganga, Madras Water supply, Galeru-Nagari, Srisailam Right Bank Canal and Penna-Ahobilam reservoirs.  On the same basis Srisailam Left Bank Canal must be supplied water during 30 days instead of 90 days by constructing  additional balancing reservoirs across the streams and its tunnel must be suitably widened.  Similar changes must be applied for Kalwakurti, Nettempadu and Koyalsagar projects.  Due to extensive irrigation by using pumpsets in Maharashtra and Karnataka the ground water utilisation data from 1970-2000 shows that there is a drastic reduction in ground water table, going down by 20 meters below the bed of Krishna and its tributaries in some places and the loss of inflow into Krishna at Karnataka-Andhra border is estimated to get reduced by 65 TMC.  The regenerated flow anticipated by the Bachawat Tribunal amounting to 70 TMC has become negligible due to intensive irrigation.  Irrigation experts estimated that there is  presently a reduction of 400 TMC out of the 75% dependable flow of 2060 as estimated in 1976.  If the water starved farmers of Rayalaseema, Nalgonda and Mahaboobnagar have to obtain water for drinking, industries and Agriculture at the prescribed dependabilities of 100%, 90% and 75%  respectively as per the policy of Government of India,  the availability of water must be scientifically determined and for this purpose it is necessary to examine the annual water yield, utilization and surplus flows from the main river Krishna and its sub-basins under Tungabhadra and Bhima tributaries.
1. Water availability from Krishna and its 12 sub-divisions: 
The  expert committees have divided the catchment of Krishna river into 12 divisions.  The first division extends from Westernghats to 70 miles along the river covering the districts of Satara, Sangli, Kolhapur and small part of Bijapur.  This section gets an annual flow of 550 to 650 TMC.  Bachawat Tribunal permitted projects for utilizing 230 TMC  and the remaining 320 TMC flows into Karnataka region.  The second division extends upto the confluence of Krishna with its tributary Bhima and the area covers Belgaum, Bijapur, Gulbarga with  a small portion of Sangli.  The water generated in this section is 35 TMC where as Bachawat permitted projects to utilize 400 TMC including Alamatti project which is part of Upper Krishna Project including Hipparigi barrage, and Narayanapur projects for which 160 TMC is allotted.  The 3rd division comprises Ghataprabha catchment covering Belgaum and Bijapur and small portions of Ratnagiri and Kolhapur. The water generated is 130 TMC while Bachawat permitted the utilisation for 100 TMC.  The 4th division covers Malaprabha catchment covering Dharvad, Bijapur and Belgaum.  The water availability is 55 TMC and Bachawat permitted utilization of 56 TMC.  The 5th division covers upper Bhima catchment upto the confluence of Sina tributary with Bhima river comprising the areas of Puna, Satara, Ahmednagar, Sholapur and Osmanabad in addition to small part of Bijapur.  The water produced in this division is 365 TMC while Bachawat permitted projects for utilizing 328 TMC.  The 6th division extends over 110 miles between the junction points of Sina river with Bhima and Bhima with river Krishna.  This lower Bhima catchment covers Bijapur, Gulbarga and Bidar with small portions of Maharashtra districts.  The water generated in this region 55 TMC while Bachawat Tribunal permitted projects for utilization of 50 TMC.  The 7th division covers lower Krishna basin from the junction of Bhima with Krishna upto Bay of Bengal with the exclusion of Tungabhadra, Musi, Paleru and Munneru.  This area covers parts of Raichur, Hyderabad, Nalgonda, Kurnool, Krishna and Guntur.  This area gets water yield of 126 TMC but Bachawat permitted projects for utilizing 576 TMC.  The 8th division comprises Tungabhadra catchment excluding Vedavati and covers Shimoga, Chikamagalur, Chitradurg, Dharwad, Ballary, Raichur and Kurnool.  The water availability is 430 TMC  while Bahawat Tribunal permitted projects for utilization of 420 TMC.  The 9th division covers Hagary, alias, Vedavati catchment which produces 56 TMC while Bachawat permitted projects for utilization of 54 TMC.  The 10th division covers Musi river catchment which produces 46 TMC of water while Bachawat permitted utilization of 34 TMC.  The 11th division covers Paleru river that produces 16 TMC of water while Bachawat tribunal permitted utilization of 10 TMC.  The last division No.12 covers Muneru catchment which produces 78 TMC while Bachawat permitted utilization of 36 TMC.
2. Illegal water diversions by Maharashtra and Karnataka:
According to Bachawat tribunal Maharashtra and Karnataka have to construct projects for utilisation of Krishna water upto specified limits under each specified sub-basin.  But the upper states have  recently constructed projects that were rejected by the Bachawat tribunal for making illegal use of additional waters of Krishna river by violating the orders of Bachawat Tribunal.  For instance Bachawat Tribunal permitted for Upper Krishna project comprising Hippargi barrage, Alamatti and Narayanapur combined reservoirs  the use of 155 TMC.  But Karnataka has increased the size of the Alamatti dam, installed many lift irrigation pumps  and widened the irrigation canal sections under this project for illegal diversion of more than 150 TMC of water.  Moreover it has prepared a master plan not only to utilize its allotted share of 734 TMC of Krishna water but also illegally divert 422 TMC of Krishna water raising the storage in Alamatti dam upto a level of 528 meters.  But Maharashtra has also copied the example of Karnataka for using not only its allotted share of 585 TMC  but also has constructed many barrages and installed lift schemes on their reservoirs for illegal diversion of more than 500 TMC of Krishna waters.  The Karnataka state Government appointed an expert committee to submit a report on the illegal projects taken up by Maharashtra on the basis of a report submitted by Sri.Panchappa Kalburgi, Opposition leader in Bijapur Panchayat Samiti alleging illegal diversion of 500 TMC  of Krishna water by Maharashtra Government.  The expert committee headed by the Chief Engineer of Gulbarga irrigation circle of Karnataka Government found that Maharashtra has made excess storage of 165 TMC of Krishna waters through various illegal projects for making excessive use of about 300 TMC of Krishna waters . In addition Maharashtra is spending more than Rs.500 crores to divert 130 TMC of Krishna water through a tunnel from Patan taluk under Krishna-Bhima stabilization project that discharges 68 TMC into Ujjani reservoir on Bhima river.  Among the many projects taken up by Maharashtra there are many illegal projects which have been rejected by Bachawat Tribunal.  The following projects are on Krishna river Balakwadi, Dhom, Nagewadi, Mahu, Kudal, Kaner, Uramodi, Tarali, Uttarmand, Kodaki, Koyna, Kera project site, Morana, Guredhar, Wang, Aivatima, Soli, Varna, Kadavi, Kasari, Kumbi, Damani, Radhanagari, Tusasi, Kallammvadi, Patgoan, Hiranyakeshi, Chikotra, Chitri, Patakwati, Jabare, Jangamhatti, Nehar, Uralwadi, Siddewari and Basappawadi. The following projects are on Bhima river Chilewadi, Pimpalgoan Jogi, Pushpawati, Manikdoh, Yadgoan, Vadaj, Dinche, Ghod, Visapur, Kalodi, Bouskman, Bamasked, Anda Talav, Vadivale, Shirvacha, Aimal, Lonawala, Jadhav Wadi, Pavana, Mulashi, Kasar Sahi, Timghar, Parasgoan, Kadakvasala, Gunjwani, Pansheth, Ujjani, Chirmodi, Bhatgoan, Niradevphal, Veer, Andali, Muswad, Ranand, Katghal, Padvalkarwadi, Chikalagi, Doddnala, Sankh, Bhivaragi, Kada, Kambli, Mahakari, Sena Nigad, Rooti, Mangi Talav, Bhanganga and Sakath
3. Reasons for non-arrival of Krishna, Bhima and Tungabhadar waters into Srisailam Reservoir:
In view of of the hundreds of projects, barrages, diversion weirs and lift schemes taken up by Maharashtra  there is no possibility for Upper Krishna river water to reach the Alamatti reservoir in Karnataka.  Consequently the normal flows for Alamatti dam cannot reach in sufficient quantities for utilization by any irrigation projects in Andhra Pradesh as anticipated by the Bachawat Tribunal that allocated to A.p.state about 500 TMC of water produced from the Upper states of Maharashtra and Karnataka.  In view of the large scale diversions of Tungabhadra water by Karnataka there cannot be any over flow from Tungabhadra and Bhima rivers also into Andhra Pradesh except during years of heavy rainfall due to intense cyclones that cause heavy floods.  Maharashtra and Karnataka will permit Krishna river flows into Andhra Pradesh only when the floods threaten the safety of the dams in Maharashtra and Karnataka.  Hence Andhra Pradesh must investigate on the nature and magnitude of illegal water projects taken up by Maharashtra and Karnataka on Krishna, Bhima and Tungabhadra and their tributaries and fight along with Karnataka against the illegal projects so that atleast the minimum river flows are permitted into Andhra Pradesh for ecological purposes like drinking, irrigation, fisheries protection and environmental sustainability of wild life in Andhra Pradesh.
In order to resolve this serious problem of water scaricity for making available dependable water for irrigation in Rayalaseema the following projects for diversion of Indrawati water through Penganga into Srisailam Reservoir amounting to 500 TMC and another project also prepared by National Water Development Agency to link up Alamatti with Pennar must be taken up as National projects to save the interests of the farmers of Rayalaseema in particular and Andhra Pradesh in general.  The details of these projects formulated by the Union Ministry of Andhra Pradesh for the benefit of the people of Andhra Pradesh are presented here.
http://www.hindu.com/2007/05/27/stories/2007052712060500.htm
These web sites show that Maharashtra is using 1100 TMC in place of 585 TMC in Krishna river water share including 50 TMC extra from Bhima river basi,thereby making the karnataka portions get dry earlier
ALMATTI - PENNAR LINK
The Proposal: For interlinking Krishna with Pennar, three links are envisaged.  Almatti -Pennar is the first link.  This link will divert 1,980 Mcum of water and will provide enroute irrigation to 2.58 lakh hectares (1.76 lakh hectares in Andhra Pradesh and 0.82 lakh hectares in Karnataka), utilizing 1,714 Mcum of water.   A provision of 56 Mcum has been made towards domestic & industrial requirement enroute.  The quantum of water diverted through this link canal will be made available at Almatti in exchange of the surplus waters of Mahanadi and Godavari basins transferred to Nagarjunasagar from the river Godavari. This link canal will run for a length of 587 km., which includes 5 tunnels of different lengths totaling 35.66 km. 
Engineering Aspect: The link proposes to utilize the Existing Almatti reservoir in Krishna basin, which is a component of the ongoing Upper Krishna Project with a gross storage capacity of 3,440 Mcum at FRL 519.60 m under Stage-II. Along with this ongoing project, one more reservoir at Kalvapalli and the existing tank at Bukkapatnam in Pennar basin are also proposed as the head works required for the link canal.  The total length of the conveyance system is 587 km including 5 tunnels to cross ridges and avoid heavy cutting.  The link canal is proposed to be operated for 180 days from June to November in a year with a designed discharge of 230 cumecs at head.  The canal takes off from Almatti reservoir at FSL 510 m and crosses Tungabhadra and Vedavathi rivers and joins the proposed Kalvapalli reservoir on Pennar river and runs further to join the stream of Maddileru a tributary of Pennar river via existing Bukkapatnam tank.  The diversion is entirely by gravity.
Environmental Issue: The existing Almatti reservoir submerges a total area of 48,787 ha.  About 22 villages with 80,000 populations will be affected due to the project.  Along the canal alignment about 71 ha of forest land will come under submergence for which a compensatory afforestation programme for 142 ha of land have been evolved in order to compensate loss of vegetation.
INDRAVATI-WAINAGANGA-KRISHNA (SRISAILAM):
 Among the tributaries of the Godavari, the Sabari, the Indravati and the Wainaganga contribute most of the surplus.  There is a natural-by-junction of the river Upper Kolab in the Upper reache sand the Indravati, where the right bank of the Sabari on this point into Indravati and take advantage of the regulated releases from upper kolab. This will augment the supply in the Indravati valley and ultimately in the proposed link.  The livestorage on the Upper Kolab is 0.789 TMCum (27.863 TMC) With this it may be possible to tap a contribution of about 1.2234 TMCum. (43.204TMC)from the upper kolab.  It is proposed to have a series of dams on the Indravati to stroe water and have regulated releases for successive power generation. With this net work of storages in the Sabari-Indravati Complex it is expected that 12.3 TMCum.(434.374 TMC) of surplus waters will be made available for utilization in this link after committed utilization in the basin itself.  It is expected that within the basin the scope for local utilization is rather limited as the areas is hilly covered with thick forests.
The FRL at Dhudma dam site at Indravati is [proposed to be +228.66 M (750ft) It is contemplated to take out a link canal from this dam which will run in a North Western direction and will be connected to a tributary of Wainaganga which   joins it at the Garchirioli site.  The length of the link will be about 126km (80 miles) including the river reach.  All the waters brought by the Sabari-Indravati-link up will be transferred through this link to Wainagaga at Garchiroli. The dam site is proposed at Garchiroli with an FRL of 218 m (715ft) to store about 4,933 TMCum (174.209 tmc) of waters there.  It is proposed to have a transfer of total 16.04 TMCum (566.453TMC) OF WATERS FROM Sabari-Indravati-Wainganga Link-up from Garchiroli.  A link canal has been proposed to take off at an elevation +213.11m (700) and follow a contour canal alignment with a bad slope 1m in 10’5km .  The waters are then lifted in successive reaches by about 122M (480ft) to cross Warangal ridge between Godavari and Krishna Basin.
The canal ultimately tails into reservoir at Srisailam on the Krishna at +885ft.  A toal tunnel length of 94.5km (59miles) is involved in three reaches.  The first two reaches are just before the Godavari crossing, accountisng for 54.5km (34miles) and the 3rd reach is just before the Srisailam reservoir.  The total length of the link Wainganga to Srisailam works out to 650km (406miles).  A bed slope of 1m in 1.05km (1’in 2 miles) is provided for in the link.  After the link crosses the Godavari, it irrigates an area of 0.323 million ha. (0.798 million acres) utilisisng 1.85 TMCum. ( 65.333 TMC0 of waters en-route to Srisailam reservoir.  Thus, in effect 14.18 TMCum (500.767 TMC of waters are transferred to the Krishna rivers through Sabari, Indravati, Wainaganga-Krishna link.
KRISHNA(SRISAILAM)-PENNAR (GANDIKOTA)-CAUVERY(UPER ANICUT LINK):
It is proposed to transfer 14.18TMCum (500.76 7 TMC) of waters brought through the link described above southward for utilization in Rayalaseema and Tamilnadu areas.  A link canal has been proposed to take off at elevation +265.24m (870) from the Srisailam reservoir for transfer of 14.18 TMCum (500.767tmc) southward.  Thealignemnts follows generally, the alignments proposed for the Srisailam Right Bank canal, proposed by the Government of Andhra Pradesh.  This link tails off to the Gandikota reservoir proposed tobe constructed on Pennar with FRL of 228.65(750’) It has been envisaged that the canal will provide irrigation to the Rayalaseema areas in the region of Kurnool-Cuddapah canal and the Sangameswar canal system to provide additional irrigation of 0.4897 million ha.  (1.21million acres) utilizing 2.96 TMCUM (104.532tmc of waters.   Thus 11.225TMCum. (396.411 TMC) of water will actually be transferred to the Pennar at Gandikota.  The live storage of 3.7TMCUM (130.666 TMC) has been proposed here.  The length of Srisailam-Gandikota link will be 184km  (115tmc) and will have a bed slope of 1m in 10.5 km
AT Gandikota 0.986 tmcum. (34.820tmc) of water is proposed to be released for utilisation in the delta areas of existing Pennar irrigation.  Thus an equivalent of 0.886 TMcum of waters which flow to the delta is proposed to be tapped in the drought prone areas.  Thus 0.986 TMCum (34.820tmc) of waters will be rendered surplus for utilization in the drought prone areas of Rayalaseema in Andhra Pradesh in Upper Pennar reach
Besides the above, 10.24 TMCum. (361.626 tmc) of waters will be released in the Pennar river and tapped at the proposed barrage at Proddatur on the Pennar for diversion south-ward.  The pond level in this barrage is proposed to be +152.44 m (500ft) and a canal is to take off from this point and run through Rayalaseema areas and Tamilnadu as a contour canal and tail off into the pond at upper anicuts on Cauvery +76.22m  The length of the link from Proddatur to upper anicuts will be 800km and willhave a bed slope of 1m in 10.5km (1’in 2miles) The link envisages provision of irrigation to an area of 0.1647 million ha (0.407 million acres) in Rayalaseema areas of Andhra Pradesh utilizing 0.986 TMCum (34.820tmc) of waters and 0.592 millionha. (1.463million acres) of irrigation in Tamilnadu utilizing 4.317tmcum (152.455tmc) of waters.  This liknk in Andhra Pradesh will pass through a tunnel of about 9.6km (6miles length.


ACKNOWLEDGEMENTS:   Former Karnataka leaders Sri.K.Ramakrishna Hedge, former Chief Minister of Karnataka who worked as Dy.Chariman, Planning Commission during 1970s and former Union Minister Sri.Sankaraanand who worked as Union Minister have worked hard to help Karnataka farmers to obtain more water from Krishna river by using their good offices to secure higher share of water for storage with an increased height of Alamatti dam at any cost have also graciously conceded the demands of the water deficit Krishna delta farmers and devised alternate methods of supplying Godavari water by transfering the same from upper reaches of Sabari, Indravati and Wainaganga for transfering about 500 TMC into Srisailam reservoir for utilisation by the Telangana, Krishna delta farmers and also by proposing a link from Alamatti to Pennar for supplying water to the farmers of Rayalaseema.  This planning was done at their instance during 1970s and 1980s and for their well intention actions however unpalitable they may be for the irrigation engineers and politicians of Andhra Pradesh and consequently they proposed that these projects must be taken up in the national interest by the Union Government.  Now the Second Krishna Tribunal by its recent orders has ensured materialisation of these dreams of the Karnataka and Maharashtra leaders and it is now for the Andhra Pradesh leaders and the Andhra Pradesh farmers and farm workers to demand their elected representatives in the state legislature and parliament to exert pressure over the Government to take up these schemes as national projects for ensurisng sustainable development of the state and the nation.

About Me

My photo
Born in 1932 at Mudinepalli, near Gudivada, Krishna Dist. Andhra Pradesh, received Bachelors degree in Civil Engg., from Viswesaraiah Engineering College, Banglore (1956) and Masters Degree in Environmental Engineering from Rice university, Houston, Texas, (USA) (1962), Ph.D (Hony). Former Head of the Department of Civil Engineering and principal of College of Engineering, Andhra university.Formerly Hony.Professor in Andhra University,Manonmanian Sundarnar University,JNT University. Fellow of the Institution of Engineers,India Recipient of the University Grants Commissions National Award "Swami Pranavananda Award on Ecology and Environmental Sciences" for the year 1991. Recipient of Sivananda Eminent Citizen Award for 2002 by Sanathana Dharma Charitable Trust, Andhra Pradesh state. Presently Working as Director, centre for Environmental Studies, GITAM University, http://www.geocities.com/prof_shivajirao/resume.html http://www.eoearth.org/contributor/Shivaji.rao